loader image
Past
Projects
Transformed Karachi Through Accomplished Initiatives

Restoration of Orangi Nallah Project

As per NED University Map ID’s (Storm Water Drain)

Length of Orangi Nallah as per NED University Map ID

Total Length of Orangi Nallah

11,287 Meters / 11.287 Kilometers

Total Length Both Sides of Orangi Nallah

22,574 Meters / 22.574 Kilometers

Total Intercepting Units

1,703

Number of Units Above to 30% Eligible for Compensation

1,127

Detail of Both Sides

(Structure IDs Numbering & Marking of Hard Encrochment)

Completed From 15-02-2021 TO 19-02-2021

District West

Zero Point Pakistan Bazar

To

Banaras

Area Covered

Left Bank

5,300 Meters / 5.3 Kilometers

Right Bank

5,300 Meters / 5.3 Kilometers

District Keamari

Gharib Nawaz Colony Layari Express Way

To

Banaras

Area Covered

Left Bank

—–

Right Bank

5,987 Meters / 5.987 Kilometers

District Central

Kashmiri Mohallah Layari Express Way

To

Bangash Colony

Area Covered

Left Bank

5,987 Meters / 5.987 Kilometers

Right Bank

—–

Project Gallery

Restoration of Mehmoodabad Nallah Project

Storm Water Drain - Pilot Project

Coordination Committee

NDMA

National Disaster Management Authority

N.E.D.

Nadirshaw Edulji Dinshaw University

Sindh Police

District Administration - Police & Law Enforcement Agencies

KMC

Municipal Services Katchi Abadies Anti-Encroachment City Warden

Staff Engagement

Katchi Abadies &
Land Management
No. Of Staff Engaged - 35
Anti
Encroachment
No. Of Staff Engaged - 90
City Warden
No. Of Staff Engaged - 50
Private Labor
No. Of Staff Engaged - 50
Municipal
Services
No. Of Staff Engaged - 35
(Along with their Heavy Vehicle)

Multiple Meeting Were Held To Streamline The Execution Of Anti-encroachment Drive On Mehmoodabad Nallah (Strom Water Drain)

Mehmoodabad Nallah Encroachment Plan As Per N.E.D Map ID’s

Survey And Collection Of Data Of Each House Hold Mehmoodabad Nallah As Per N.E.D Map ID’s

Joint Teams Of Kmc Katchi Abadies, Land Kmc & District Administration Conducted Survey And Collect Relevant Data Of Each House Hold.

Joint Demarcation Of Mehmoodabad Nallah As Per N.E.D Map ID's

Co-ordination team demarcate and marked id’s on affected structure as per ned map ID's dated: 24-12-2020.

Final Execution Of Anti-encroachment Drive On Mehmoodabad Nallah - Strom Water Drain

Dated: 04-01-2021

Restoration of Gujjar Nallah Project

As per NED University Map ID’s (Storm Water Drain)

Geographical Outlook of Gujjar Nallah (Storm Water Drain)

The Gujjar Nala is Mega Project having length about 25 Kilometers (both sides) starts from Zero Point New Karachi, Nallah Stop, passing through New Karachi & Ali Muhammad Goth, Shafique More, Buffer Zone Gulberg, Samanabad, North Nazimabad, Nazimabad, Liaquatabad, Teen Hatti (Lyari Expressway).

There exist massive encroachments on both sides.

Co-ordianation Committee

Joint Demarcation of Gujjar Nallah as per NED Map ID. The Co-ordiantion team demarcate and marked ID’s on affected structure.

NDMA

National Disaster Management Authority

N.E.D.

Nadirshaw Edulji Dinshaw University

Sindh Police

District Administration - Police & Law Enforcement Agencies

KMC

Municipal Services Katchi Abadies Anti-Encroachment City Warden

Gujjar Nallah Demarcation as per NED Map ID.

Gujjar Nallah Drain Design Parameters (Liberal) As per NED University Map ID's

S.No. Section
(To)
Section
(From)
Section Length (m) Proposed Width of Drain (ft) Landmarks
1 0+000 0+414 414 35 Noorani Masjid Sector 11-E and Godhra Road
2 0+415 2+483 2068 40 Shafiq Mor
3 2+484 4+159 1675 50 Cafe Piyala, People's Chowrangi
4 4+160 6+081 1921 60 Jamia Masjid Ghousia, Landi Kotal Chowrangi
5 6+082 6+940 858 70 Near Dental College N Block
6 6+941 7+202 261 75 Near Zafar House Bus Stop
7 7+203 12+549 5344 80 Liyari Expressway

Progress

On the directives of the Metropolitan Commissioner KMC, Katchi Abadis Department, KMC, the work of structure ID’s numbering & marking/demarcation of hard encroachment at Gujjar Nallah site as per NED University Map ID’s has also done on 31-01-2021 with the coordination of Additional Deputy Commissioner, Karachi Central/Assistant Commissioner concerned along with Police and City Warden & staff of Assistant Commissioner Office is also collecting Data of affectees as per NED Map ID’s.

Detail of Area (Marking of Encroachment)

Completed From 27-01-2021 TO 31-01-2021

S.No. Date Distance Covered Section (From) Section (To)
1 27/01/2021 1500 Meters (Each Side) (0 Point Noorani Masjid, Sector 11-E, near Godhra) Godhra
2 28/01/2021 3000 Meters (Each Side) (Godhra stop near CNG Station) Café Pyala
3 29/01/2021 3500 Meters (Each Side) Café Pyala Zia Uddin Puliya
4 30/01/2021 2000 Meters (Each Side) Zia Uddin Puliya DMC Central (Sir Shah Suleman Road)
5 31/01/2021 2500 Meters (Each Side) DMC Central (Sir Shah Suleman Road) Teen Hatti
TOTAL: Both sides included 25,000 Meters / 25 Kilo Meters completed up to 31-01-2021.

Press Release for Removal of Encroachment on Gujjar Nallah

KMC - Anti Encroachment Press Release

The Express Tribune – 31 January 2021

KMC - Anti Encroachment Press Release

The Express Tribune – 31 January 2021

KMC - Anti Encroachment Press Release

The Express Tribune – 31 January 2021

Execution Of Removal Hard Operation And Distribution Of Compensation Cheques Amongst The Affectess Of Gujjar Nallah

18-02-2021 To Till Date

Execution Of Removal Soft Encroachment Operation Of Gujjar Nallah

Removal Of Hard Encroachmnet On Gujjar Nallah

Distribution Of Compensation Cheques Amongst The Affectess Of Gujjar Nallah

Re-survey Comprehensive Report

Restoration Of Gujjar Nallah Project As Per Ned University Map ID’s
(District Central - Strom Water Drain)

From 18-02-2021 To 07-12-2021

Length Of Gujjar Nallah As Per Ned University Map Id

Total Length of Gujjar Nallah

12,550 Meters / 12.55 Kilometers

Remaining Length of Gujjar Nallah

Nil Meters / Nil Kilometers

Total Distance Covered

12,550 Meters / 12.55 Kilometers

Detail Of Intercepting Units

Total Intercepting Units

4,058

Number of Units Above to 30% Eligible for Compensation

3,137

Total Soft Encroachment Removed
From 08-02-2021 TO 13-02-2021
Category Details
Soft Encroachment Thallahs, Patharas, Sun Sheds, Damaged Vehicles, Afghani Garbage (Kachra) Collection Points & Cattle Bara’s used commercially have been removed
Total Encroachments Removed 2,870 Soft Encroachments
Total Garbage / Debris Removal
From 18-02-2021 TO 06-12-2021
Weight 28,064 Tons
Total ID's Demolition Status
Total IDs Total IDs Demolished Total IDs Partially Demolished Remaining IDs to be Demolished
4,058 4,058 Nil Nil
No. of ID’s Demolish Partially & Completely Today : NIL ID’s
Total Distance Covered Both Side Today : NIL Meters

As per Site Inspection all ID’s has been removed, further during the re-survey FWO point out few demolishing work which will carried out after approval from Competent Authority.

Comprehensive Report

Restoration Of Mehmoodabad Nallah Project As Per Ned University Map ID’s
(District Central - Strom Water Drain)

From 15-12-2020 To 26-03-2021

Length Of Mehmoodabad Nallah As Per Ned University Map Id

Total Length of Mehmoodabad Nallah

3,500 Meters / 3.55 Kilometers

Remaining Length of Gujjar Nallah

Nil Meters / Nil Kilometers

Total Distance Covered

3,500 Meters / 3.5 Kilometers

Detail Of Intercepting Units

Total Intercepting Units

238

Number of Units Above to 30% Eligible for Compensation

56

SUB-DIVISION TOTAL CHEQUES RECEIVED TOTAL CHEQUES DISTRIBUTED CHEQUES UNDER CORRECTION CHEQUES UNDER CANCELLATION CHEQUES IN HAND TOTAL SOFT ENCROACHMENT REMOVED (04-01-2021 to 10-01-2021)
Ferozabad Sub-Division (District East) (1st Installment) 59 57 0 2 0 Soft Encroachment (thallahs, patharas, sun sheds, damaged vehicles, Afghani garbage collection points & cattle bara’s removed)
1170 Soft Encroachment
Ferozabad Sub-Division (District East) (2nd Installment) 49 47 0 0 2 TOTAL GARBAGE/DEBRIS REMOVAL (11-01-2021 to 10-02-2021)
Weight: 12,944 Tons
Total 108 104 0 2 2
Total No. of Structures Removed as per NED University ID
Current Status of Removal Operation
Total 238 IDs have been removed completely
Total Remaining IDs: Nil